One year on from our official opening, and with our building now close to fully operational, we thought it timely to reflect on the process and outcome.
The catalyst which led to building our own space was borne from frustration with the uniformity of rented offices. In late 2004, having rented four buildings in our first 10 years of business, we were keen to establish a permanent base and bought a double storey, 250sqm building in Dryburgh St, 2km north-west of Melbourne’s CBD (downtown).
Before the fit out, our building was a very functional and very unglamorous warehouse. Apart from some truly horrible toilets the ground floor was derelict whilst tenants on the first floor stored boxes of T-shirts as high as the rafters. It was the classic empty canvas.
In creating a design brief we first defined and prioritised each area in terms of size, access, light level and mood. Requirements were defined in terms of ‘must-haves’ and ‘nice-to-have-if-possible’. For example, we wanted to create a welcoming and impressive entrance, and a casual staff meals/lounge area; both achieved in the final design. However, the wish for a roof-top terrace never made it past the budget stage.

Other stories about the building (and building process) include:

  • Whilst the main street frontage is on a major commercial road, we were so attracted by the intimacy and human-scale of the ‘Little’ Dryburgh St entrance we decided to buck convention and make this our main entrance. The decision did have one unexpected consequence; the long address for such a small street is consistently mistaken by couriers and visitors, with people and parcels left stranded in the southern version of Little Dryburgh St
  • The building had an original and functional electric hoist, positioned approximately above the current staircase. Although there was a strong argument to keep it, given it represented the buildings industrial past, in the end it was decided to have it removed. It’s now happily lifting hulls by a boat builder in Williamstown
  • The architect’s original stair specifications were under-engineered so that the treads twisted alarmingly when stepped upon. The problem was fixed by boxing the central I-beam (‘stringer’) with plates, although the stairs do still have a slight movement if you know it's there
  • Tenants occupy about 15% of the building floorplan. The largest of these is Axxin; a start-up producing a new electromagnetic device.
  • The design and fit out project was expertly managed by Cobalt directors Jack Magree and Warwick Brown; Warwick a veteran of his own impressive warehouse conversion and Jack also recently renovating his own home
  • Warwick developed the final overall masterplan with assistance from architects Neil and Idle. He also project managed the building works after the architects drawings were complete
  • Operationally the studio area works by positioning desks facing out and their monitors facing in. This was done to encourage teamwork where staff can see each other’s work and contribute suggestions as they moved throughout the office.